Lights!!!

The lights for the high ceiling area FINALLY arrived today and the electrical contractor went right to work installing them. All 48 should be installed and powered by the end of the week. The low ceiling lights should arrive Monday 2/9 (fingers crossed).
The electrical contractor also powered up the exterior sign and told us it looks very good.



Race came to visit the store today and helped measure chain for the lights. He also modeled the uniform apron samples.