Lots of demolition work today. The ramp that was located at the back door has now been removed. It will be replaced by stairs so that we will have more floor space in our Service Room. At the outdoor patio area, the rest of the wall was removed to allow for installation of the new glass door and glass sidelight. The HVAC contractor is hanging duct work (they sure seem slow to me - it's basically like snapping together a Habitrail - what's taking so long????) The drywall contractor finished installing the second side of the dry wall (they worked on Friday after Christmas) and should start taping tomorrow. Electrical contractor keeps plodding along - we are seeing wires hanging out of conduit now.